• October 2009 - This is going to be holy ground soon 🙂
  • The entire space measures around 20m x 6m x 3m (5m height in the center above the brown fibrepanels)
  • Team Northward in the building. left to right: Steffen, Silvia Santafé & Thomas Jouanjean
  • the brown fibreboards are gone, drywall and new windows installed
  • << machineroom and bathroom >>
  • arrival of "the goods"
  • pushing the trailer into the backyard. 15cm space left and right....stunning
  • prepping the merfomer bench for the floating floor
  • cable duct
  • concrete is going in
  • supporting beams for the ceiling installed
  • ceiling decouplers
  • Outer shell sidewalls going up
  • decoupled ceiling
  • outer close to be finished
  • Inner shell construction
  • pockets for the ceiling diffusors
  • inner frontwall done
  • Backwall Basstrap system
  • cutting homatherm for the inner soft shell
  • wood for the diffusors
  • color labels according to plans 🙂
  • MERFORD acoustic door
  • "flamethrower treated" oak glued directly to the concrete. the frontwall has been coated with marmorino...forgot to take pictures of the process
  • cabling...
  • fabric....after all this "struggle" a real challenge 😉 ....if you mess it up it will look ugly forever